Another Restoration
This particular restoration also involved “stepped out – stepped back in corbelling” at the top. This type of termination does not have a concrete cap with 2″ drip edge, as required by the Ontario Building Code Water is able to enter the chimney structure through the upper steps. leading to premature deterioration.The restoration […]